For Petrochemical, shipbuilding & industrial construction & maintenance.
   There is practically no scaffold job that cannot be done with PARAS.  It makes no difference whether the jobs is building construction, renovation or cornice removal, pressure vessels, heat exchangers, furnaces, cooling towers or piping, PARAS SCAFFOLDING can be erected to do the work efficiently and safely.
    Here are just a few of the reasons why PARAS SCAFFOLDING is ideal equipment for oil refinery maintenance and repairs.
     Since most every Petrochemical & Fertilizer units are of different size or shape an all-purpose, scaffold is required PARAS SCAFFOLDING is virtually unlimited in height & shape.  There are virtually no obstructions which cannot be overcome with PARAS. 
     Cracking towers & their complex piping can easily be scaffolded with PARAS to provide working platform at any desired level.
GUARD RAILS: shall not be less than 36 inches, or more than 42 inches, in height. Mid rails should be halfway between platform and top rail.
TIES: The entire scaffold shall be tied to, and securely braced against, the building at intervals not to exceed 3 feet horizontally and 26 feet vertically.
BEARERS: shall be installed transversely between posts and shall be securely clamped to the posts directly above the runner. When coupled directly to the runners, the couple must be kept as close to the posts as possible. Bearers shall be at least 4 inches, but not more than 12 inches, longer than the post spacing or runner spacing. Maximum bearer width for light duty use is 6 feet; for medium duty use, the maximum width is 5 feet.
RUNNERS: shall run the length of the scaffold and be placed inside of both vertical posts. They shall be inter- locked to form continuous lengths and clamped to each post. The bottom runners shall be located as close to the base as  possible. Vertical distance between runners shall not exceed 6 feet 6 inches.  
BRACING: shall be installed across the width of. the scaffold, at least every third set of posts horizontally, and every fourth runner vertically. Such backing shall extend diagonally from the inner and outer runners upward to the next outer and inner runners. 
POSTS: Shall be accurately spaced, erected on suitable bases, and maintained plumb. Maximum horizontal spacing for medium duty use is 10 feet, and 8 feet for light duty use.
DIAGONAL BRACING: (outside of posts) on the inner and outer rows of posts shall be installed at approximately 45° angle from near the base of the first outer post upward to the extreme top of the scaffold. Where the longitudinal length of the scaffold permits, such bracing shall be duplicated beginning at every fifth post. In a similar manner, diagonal bracing shall also be installed from the last post extending back and upward toward the first post. When conditions preclude the attachment of this bracing the posts, it may be attached to the runners.

"PARAS" Scaffolding is easy to handle since it is erected from only five individual components. Strong, slender PARAS members offer a minimum of wind resistance. PARAS components will pass through extremely small openings, making it possible to erect scaffold- ing inside tanks.The same basic components can be used to erect PARAS Rolling Scaffolding for work which required a moveable platform. PARAS SCAFFOLDING is manufactured with normally 40 mm bored steel tubes. BECAUSE of its strength and simplicity of design, "PARAS" scaffolding components require an absolute minimum of maintenance. However, certain simple inspection and maintenance procedures should be followed to help assure safe, trouble free scaffolding. Bend tubes can be straightened and stored according to length.. Seriously damaged or split tubing should be discarded or cut into shot lengths for shot bears, after fittings have been removed. When necessary, tubes should be cleaned by hand with a wire brush or wire brush machine. During the cleaning operation male and female fittings should be inspected fully.
Couplers should be inspected closely for damage which would affect their safety. Studs should be kept covered with a light film of Oil. Eye bolt and nuts must be checked for security as well as for proper fit and stripped threads. When necessary, coupler should be cleaned with a wire brush. Fixed and swivel couplers can then be binned separately
Bases should be inspected for damage, cleaned by wire brush when necessary and stored in bins.
Although "PARAS" scaffolding requires an absolute minimum or repair, it may develop that replacement of certain parts will become necessary because of damage in handling etc.
CAUTION
Serious injury may result from improper erection or use of scaffolding equipments. Erectors and users must be familiar with detailed instruction pertaining to the products shown herein.

Double Coupler
* To Connect scaffold tubes at 900
* Available in Two sizes 40 mm X 40 mm
Swivel Coupler
* To Connect two scaffold tubes at any angle.
* Available in Two sizes 40mm X 40mm, 50mm X 50mm
Scaffold Pipe
* All scaffold pipes are to be blinded at both 
   ends just to prevent entrance of foreign 
   particles, corrosion and misuse of scaffold 
   pipes. ERW pipes as per IS 1239 are 
   available in various lengths such as 1.5 
   mtr. long, 6 mtr. long etc.
Expanding  Joint Pin ( End to End Coupler )
* For quick & secure end to end connection of
   scaffold tubes internally
* IMPORTANT : For use only where tubes are in 
   compression & bending
* Available in two size 40 mm X 40 mm & 50 mm X
   50 mm
Testing of Coupler
* Sample Pc from each batch is tested as 
   per IS 2750
Propex A mini Prop provides upto 300 mm adjustment 
           closed Ht. : 600 mm Extended  Ht. : 900

Adjustable Stirrup head U head at top for carrying in runners.
Threads allow for 225 mm adjustment.

Other Products :
* All purpose scaffold units  * Centering equipments * Adjustable telescopic steel prop.
* Adjustable stirrup head     * Drum lids
Fabricated steel planks The scaffold steel planks are very good replacement to wooden planks.  These types of steel planks are more sturdy, light in weight, cannot catch fire & have a long life.  There is a 100 % return after its use.

Home   |   Products  |   Feedback

Designed & Hosted by Gujarat Industries Directory